Shanghai LNG Deputy Chief engineer: Ningbo LNG, Zhejiang Province has been building cold energy power generation equipment.

[Shanghai LNG Deputy Chief engineer: Zhejiang Ningbo LNG has been building cold energy power generation equipment]. This afternoon, at the 2023 Shanghai International carbon neutralization Expo, talking about the cold energy power generation expansion plan, Zhong Juner, deputy chief engineer of Shanghai LNG Company under Shenneng Group, told the Financial Associated Press, "at present, Zhejiang Ningbo LNG is already building cold energy power generation equipment, and there are many LNG receiving stations with this idea. The Shanghai station line expansion project is also considering the construction of another cold energy power generation plant. " According to Zhong Juner, the LNG gasification capacity of the device is 205t / h, and the designed annual power generation is 24 million kWh, accounting for about 1x4 of the total annual electricity consumption of the LNG receiving station. It can reduce energy consumption by nearly 7000 tons of standard coal per year and reduce carbon emissions by 10000 tons. Small financial note: Shanghai LNG was successfully connected to the grid and debugged at the end of April 2023, assembling the first domestic and the largest LNG cold energy power generation device in the world, filling the gap in domestic LNG cold energy power generation. (financial Associated Press reporter Xing Qixin)